You don't have javascript enabled. Good luck with that.
Pencarian
 Waduk Bojong Rawa Buaya di Keruk SDA Jakbar
.
photo Rudi Hermawan - Beritajakarta.id

Bojong Reservoir Dredging Targeted to Finish By the End of This Month

West Jakarta Water Resources (SDA) Sub-agency accelerates mud dredging work in Bojong Reservoir on Jalana Telaga Bojong, Rawa Buaya, Cengkareng, West Jakarta.

We carry out the work from November 17 and target it to finish by the end of December

"We carry out the work from November 17 and target it to finish by the end of December," conveyed Wawan Kurniawan,  SDA Sub-agency's Flood Control Maintenance System for Clean Water and Wastewater Section Head, on Tuesday (12/1).

His side deployed 2 heavy equipment with amphibious and long excavator type and 8 dump trucks to dredge mud from reservoir with depth of 3 meters and 1.6 hectares wide.

Mampang River Along Jl. Pondok Karya Dredged

"We dredge the mud thus reservoir can drain water optimally to anticipate inundation in the surrounding area," he mentioned.

Linked News
Popular News indeks
  1. Transjakarta Officially Opens School for Bus Drivers

    access_time20-11-2024 remove_red_eye1065 personAldi Geri Lumban Tobing
  2. Parekraf Agency Introduces Jakarta as a Global City at IBTM World 2024

    access_time23-11-2024 remove_red_eye939 personAldi Geri Lumban Tobing
  3. Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

    access_time20-11-2024 remove_red_eye928 personFolmer
  4. Jakarta Baznas Bazis Ready to Support Disaster Preparedness

    access_time25-11-2024 remove_red_eye768 personAldi Geri Lumban Tobing
  5. Gubernatorial Election Logistics in Seribu Island Distributed

    access_time26-11-2024 remove_red_eye590 personBudhi Firmansyah Surapati